During May or June month land should be deep ploughed and get freely open so that harmful soil born insects and other undesired substances will be destroyed.
As per requirement 10* 3*1 ½ ft bed should be prepared. Properly mix 50 Kg/bed organic compost .
In the mean time waste things should be cleaned from bed. After that according to rows seeds are put on the beds . After that seeds are covered by ½ cm thick layer of brawn of rice and wheat. now prepared beds are ready to produce stevia plant.
Precautions :
Bed should be prepared under shadow area.
The bed preparation area should be well drained .
Bed soil should be insect free.
Use appropriate insecticide , bactericide, fungicide to protect stevia from insect or dieses.
Bird net should be used to protect bed from the birds.
IRRIGATION :
Maintain moisture according to weather on the stevia bed .
Be careful ample supply of water invite insect dieses. So irrigate once in a day in winter and 3 or 4 times in a day in summer.
Bed height should be 1 to 1 ½ feet above from surrounding land.
Keep 2 to 3 feet distance between 2 beds so that intercultural practices should be one properly.
After 5-6 days stevia plants get started grow.
Conteneous irrigation should be done as per requirement.
After 5 to 6 week stevia plants are ready for transplantation. Carefully take out plants and put them on cold and well moisture place.
As much as possible transplant the plants on main land.
ACI Agro Solution
ISO 22000-2005,ISO 9001:2008, FSSAI, SSI, Seeds, Spice Board Of India, WHO GMP & NPOP, USDA, SGS organic certified.
Add.: J-507, AB, Sarna Dungar Industrial Area JAIPUR (RAJ.) 302012
MOB NO. +91-7597920642, +91 9414246808, +91-9314507433 (Neeraj Bhatnagar)
email: info@aciagro.com, director@aciaagro.com , marketing@aciagro.com
http://www.aciagrosolution.com
http://www.stevia.blogspot.com
http://www.indiamart.com/aciagrosolution
www.aciguarclutivationinindia.blogspot.in
No comments:
Post a Comment